• 中文
  • English

Hunan: Construction of Yongzhou large waste treatment plant

2021-10-28 16:12:38

Click:

Yongzhou news yesterday, the construction of two waste transfer stations in Baizhu Road, Lengshuitan District, Yongzhou City and Pingzhou East Road, Zhishan District officially started. The estimated

Yongzhou news yesterday, the construction of two waste transfer stations in Baizhu Road, Lengshuitan District, Yongzhou City and Pingzhou East Road, Zhishan District officially started.

The estimated total investment of the first modern large-scale waste treatment plant in Yongzhou is 164 million yuan, with a daily treatment of 860 tons of waste, covering an area of 1000 mu, a total storage capacity of 10.75 million cubic meters and a service life of 30 years. The project adopts sanitary landfill process and mainly constructs 9 functional areas, namely waste collection and transportation system area, landfill area, leachate treatment area, management, living and environmental protection monitoring area, high-level pool area, borrow area, biogas storage and utilization and comprehensive utilization of waste research system area, maintenance area and reserved multi-functional waste treatment area.


Author: BEIJING TDR ENVIRON-TECH CO., LTD.
0
Hunan: Construction of Yongzhou large waste treatment plant
Yongzhou news yesterday, the construction of two waste transfer stations in Baizhu Road, Lengshuitan District, Yongzhou City and Pingzhou East Road, Zhishan District officially started. The estimated
Long by picture save/share

About Us

News

Product 

DT

DTL

MBR

Anaerobic Technology

V-MEMD

HCOS

HP-NF

DTZ

WEDR

Industrial

Service

Join Us

Copyright © 2021   1818vip威尼斯首页   All Rights Reserved    京ICP备05000417号-1   技术支持:飞色网络

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了